banner-img

News

It only takes 1 day for an installation company to open for business? How to do it?

Can the traditional way of decorating the craft exhibition hall be completed in 30 days?

From design, material selection, construction, correction to delivery, the owners of decoration companies who have worked in craft showrooms basically don't want to repeat the past!

Then, the craft exhibition hall can be installed in 1 day! is it possible?

Use modular showcases to integrate all construction processes into each individual showcase:

The process flow is modularized, the finished product is put into the cabinet, and no on-site construction is required;

The workmanship is comprehensive and professional, without modification, addition or subtraction;

Packaged and delivered as a whole, it can be installed at the store, and can be displayed after being fixed on the wall;

The auxiliary materials are detachable and replaceable, and it is very convenient to replace them by yourself

Free splicing, flexible installation, and convenient space layout

sdtrf (4)
sdtrf (5)
aeds (4)
aeds (3)

It is so complete, the whole process is supported, one-stop purchasing, it can be used on the wall, whether it can be completed in one day, welcome to challenge!

aeds (5)

(Customer case showroom)


Post time: Jul-27-2023

Send your message to us: